RAN Sailingvídeo

Interior Kickoff: Teak, Insulation & Stanchion Reinforcements! - Ep. 466 Ran Sailing

21 de novembro de 2025 · 24 min · 97K visualizações · Skåne

O que este vídeo aborda

Construction of a 52-foot custom sailboat interior focuses on hull-side insulation, teak paneling, and electrical routing. Johan and Malin install watertight cable transits from Rockstech through the bulkhead to manage wiring between compartments.3:08 To prevent future leaks, they reinforce stanchion bases by gluing and tabbing solid glass into the hull, later drilling these to mount duplex steel rods that eliminate the need for through-deck bolts.13:41 The interior hull sides receive strips of old-growth Burmese teak, ripped on a table saw using a thin-kerf blade to minimize waste.10:31 These strips will feature a matte varnish finish and be secured with plugged screws.19:52 Before finalizing the teak installation, the crew installs PVC and flexible conduits for AC/DC power and lighting, alongside acid-proof stainless steel cable trays.16:04 They plan to finish bulkheads with vinyl wall coverings to reduce sound reflection and minimize the need for extensive fairing.21:48

Ver no YouTube

Mais de RAN Sailing

This Is Where Boat Builds Break People - Ep. 501 Ran Sailing08/2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailing08/2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailing08/2026Making Our Sailboat One Solid Structure - Ep. 498 Ran Sailing08/2026

De RAN Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema