Catamaran Mistertong vídeo

#225 Disassembling the nacelle …

9 de junho de 2026 · 45 min · 8K visualizações

Man cuts boat hull with grinder, sparks flying

O que este vídeo aborda

Refitting an Outremer catamaran in a boatyard in Carriacou, the owners focus on structural repairs and system upgrades to prepare the vessel for relaunch. The crew completes the installation of new through-hull fittings and valves, utilizing Loctite 577 thread sealant for both the fittings and the plumbing connections.22:26 Structural work includes drilling and preparing mounting points for the trampoline support beams and the bobstay chainplate, followed by the application of epoxy inserts.19:59 The team also addresses localized moisture damage in the aft port cabin, where they remove old fiberglass tabbing and inspect the plywood bulkheads.4:59 To protect the hull and fittings, they apply an epoxy primer, noting that Coppercoat must be kept isolated from brass components.23:51 The project remains subject to the operational status of the local boatyard, which has faced closures and logistical delays.12:49 The owners also discuss the use of automotive-grade two-part polyurethane paint as a cost-effective alternative to marine-specific coatings for certain structural components.36:25

Ver no YouTube

Mais de Catamaran Mistertong

#245 The break didn't last very long…08/2026#244 Worrying: Our boats held hostage in the Caribbean08/2026#243 Locked in until when???08/2026#242 The engine is no longer spitting!!!08/2026

De Catamaran Mistertong — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema