Sailing Yabávídeo

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabá

27 de setembro de 2026 · 43 min · 41K visualizações

O que este vídeo aborda

The crew of the Brazilian schooner Yabá replaces the vessel's aging, furling-based sail inventory with a new gaff-rigged setup.0:55 The project involves removing the existing furling systems and aluminum stay sheaths to accommodate new sails fitted with piston hanks.2:45 To support the new configuration, the crew modifies the booms, installs custom goosenecks fabricated by a local shipyard, and mounts new blocks and halyards to the mast.23:38 The owner reinforces the main sheet attachment point on the cabin roof using through-bolts and counter-plates to handle increased loads.25:45 Because the vessel lacks lazy jacks, the crew plans to flake and tie the sails manually during drops.37:21 After completing the rigging modifications, the crew prepares for a 200-mile passage from their current location to Caravellas, Brazil, intending to test the new sail configuration during the transit.18:01

Ver no YouTube

Mais de Sailing Yabá

Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabá09/2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabá09/2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabá08/2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabá08/2026

De Sailing Yabá — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema