Sailing Parlay Revivalvídeo

CATAMARAN DESIGN FLAW REVEALED - Cracked bulkhead repair series - Part 9 (Episode 114)

20 de junho de 2021 · 20 min · 213K visualizações

O que este vídeo aborda

Structural repairs to the bulkhead of a Lagoon 450 catamaran involve reinforcing the assembly with 18-millimeter marine-grade plywood and biaxial fiberglass.0:29 The repair addresses a recurring design flaw where large conduit holes in the bulkhead create weak points prone to cracking.14:11 The process requires gluing and screwing plywood layers to the existing bulkhead, followed by applying West Systems epoxy and multiple layers of biaxial glass.0:29 To ensure structural integrity, the crew uses fillets to create rounded transitions between the plywood, beams, and hull, allowing for continuous glass tabbing.5:03 An air roller removes excess resin and air bubbles to optimize the glass-to-resin ratio.7:04 Peel ply is applied over the final layers to achieve a smooth, textured finish that eliminates the need for grinding.7:57 The crew emphasizes that this over-engineered approach aims to prevent future structural failure, noting that the bulkhead cracking often triggers a chain reaction of damage to other frames and tabbing throughout the vessel.17:03

Ver no YouTube

Barcos neste vídeo

Lagoon 450O barco deles

Mais de Sailing Parlay Revival

Spontaneous trip to Canada to visit a special someone! - (Episode 379)08/2026Every Sailor Needs This Lightning Protection System! - Part 2 - (Episode 378)08/2026Installing the Ultimate Lightning Protection System! - Part 1 - (Episode 377)08/2026From Military Sniper to Sailing Around the World - (Episode 376)08/2026

De Sailing Parlay Revival — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema