Allende los Mares · Vuelta Verticalvídeo

How to perform a Mediterranean mooring with a shore line, arrival and departure from Med-mooring

1 de setembro de 2017 · 6 min · 119K visualizações · Bolva

O que este vídeo aborda

The crew executes a Mediterranean-style mooring in a crowded anchorage by combining an anchor drop with shore lines secured to rocks.3:12 After clearing the dinghy and weighing anchor at Bolva, the team maneuvers the vessel into a tight space.1:16 One crew member enters the water to swim lines to the shore, securing them to rock formations to stabilize the boat.3:20 The process requires precise coordination between the helm and the person on the rocks to manage the spring lines and prevent the vessel from swinging. The crew deploys 35 meters of chain to maintain position while the shore lines hold the stern in place.5:14 The maneuver demands slow, deliberate movement to ensure the lines remain clear of the propeller and the anchor holds securely against the shore-bound tension. Successful execution of this mooring technique relies on clear communication between the person in the water and the crew on deck to manage line tension and boat position.

Ver no YouTube

Mais de Allende los Mares · Vuelta Vertical

#56 Navigating Between Channels · The Vertical Hour09/2026Vertical World Tour - Northwest Passage08/2026Arctic ⛵️🌏 Northwest Passage08/2026Sailing around the world 🌎⛵️VERTICAL07/2026

De Allende los Mares · Vuelta Vertical — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema