Sailing NVvídeo
Zen and Art of Boat Maintenance | S2 Ep 43
18 de janeiro de 2025 · 24 min · 8K visualizações · Borneo
O que este vídeo aborda
The crew of the sailboat NV completes a major refit in a yard in Borneo, focusing on underwater hull maintenance despite persistent flooding in their excavated keel pit. Because the boat’s deep draft required a pit that filled with groundwater and rainwater, the crew struggled to maintain a dry workspace for sanding and painting the bulb and rudder.0:33 To manage water runoff during rain, they applied strips of tape in a bent pattern along the hull to divert water away from the work area.9:47 The team applies International Micro Ultra 2 epoxy primer and anti-fouling paint to the bulb and rudder, opting for a red finish.15:20 Additional tasks include wet sanding the hull, removing barnacles, and repairing damaged vinyl hull stickers.4:02 The crew utilizes 12-volt and 220-volt pumps to keep the pit clear, eventually finishing the underwater work during a dry night window.2:13
Mais de Sailing NV
De Sailing NV — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



