sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão
sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026

InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão

Expedition Engineering · vídeo

Time it Actually Takes : Watermaker (22)

29 de janeiro de 2026 · 21 min · 27K visualizações

Ver no YouTube

O que este vídeo aborda

Replacing failed membranes in a SeaWater Pro watermaker took two hours of real-time work, documented with a chest-mounted camera and an on-screen timer to show the unedited pace of the job.▶ 0:14 The watermaker is installed under the forward mattress in a modular configuration with two 40-inch membrane housings.▶ 0:31 The membranes had failed after several years of use, contaminating the tanks with salt water.▶ 0:05 Spare membranes had been carried aboard for years, avoiding a quoted replacement cost of $1,500 per membrane.▶ 1:16 Removing the housings went smoothly, but disassembling the end caps required a small hammer to drive corroded threaded rods free.▶ 5:08 On the second housing, using vice grips to pull a stuck end cap snapped the membrane's nipple off inside the aluminum end cap.▶ 10:26 Extracting the broken piece without destroying the soft aluminum or the internal O-ring required Allen wrenches, a screwdriver, and percussion.▶ 13:50 The O-ring sustained a small cut during extraction, and no spare of that specific size was aboard; water was used as lubricant to seat the new membrane.▶ 14:21 A Dremel cleaned a gouge inside the housing left by the extraction.▶ 16:20 After reinstallation, the system was purged of air with the low-pressure boost pump before the main pump brought pressure to 900 PSI, and the watermaker produced clean water.▶ 17:31 Corrosion on threaded rods and the directional orientation of flared seals are the two details most likely to turn a straightforward membrane swap into a multi-hour extraction problem.

Mais de Expedition Engineering

One Year Update - Custom Carbon Fiber Hardtop (26)07/2026We Finally Tried Mounting the Windows… (21)11/2025Cutting Our Losses (20)10/2025

De Expedition Engineering — veja o barco, a tripulação e todos os vídeos analisados do canal.

Reportar um problema
InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026