RAN Sailingvídeo

Floors Completed! Stringers next: Boat Building From Scratch - Ep. 418 RAN Sailing

22 de novembro de 2024 · 22 min · 107K visualizações · Skåne

O que este vídeo aborda

Johan and Malin continue the custom boat build by laminating floor beams and preparing lengthwise stringers. Johan laminates the floor beams using 10 layers of cloth, vacuum bagging each to ensure structural integrity.4:38 To construct the stringers, they glue western red cedar planks together in batches of 10 using a vacuum bag to apply uniform pressure, approximately one atmosphere.11:40 Because the hull already possesses sufficient longitudinal stiffness from its planking and long keel, the stringers are designed in sections to fit between the transverse floor beams rather than as continuous members.9:47 The pair plans to streamline the subsequent fiberglass lamination of these stringers by using a saturation table to wet out all layers simultaneously before rolling them onto the hull.20:38 Outside the workshop, they remove dead beech trees to protect the house from winter storms and apply raw sheep wool to fruit trees to deter wildlife.3:23

Ver no YouTube

Mais de RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 50209/2026This Is Where Boat Builds Break People - Ep. 501 Ran Sailing08/2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailing08/2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailing08/2026

De RAN Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema