Wildling Sailingvídeo

I Finally Put The Mast On My Ocean-Going Catamaran!

19 de julho de 2024 · 29 min · 122K visualizações

O que este vídeo aborda

Arthur completes the rigging and mast installation on his 42-foot salvaged catamaran, transitioning from a long-term restoration project to sea trials.0:43 He fabricates custom tangs for the main cap shrouds using salvaged parts, securing them with 10mm 316 stainless steel bolts and isolating compound to prevent galvanic corrosion between the stainless hardware and aluminum mast.3:43 He installs a new LED anchor and navigation light, routing new wiring through the mast and mounting the assembly with self-tapping screws and Sikaflex.12:34 After finalizing the standing and running rigging, he motors the vessel to an anchorage to test the mast step and shroud tension.21:36 He plans to perform incremental sea trials, starting in light winds of 5 knots and gradually increasing load to monitor for stress or structural failure.11:50 The project remains focused on preparing the vessel for coastal sailing on inland lakes before attempting open-sea passages.27:14

Ver no YouTube

Mais de Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refit10/2026I Lifted Her Out For a Very Important Rebuild.09/2026One Final Refit Before Crossing The Atlantic.08/20262 Days Alone at Sea On my Primitive Double-Canoe.08/2026

De Wildling Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema