MJ Sailingvídeo
Overhead Work SUCKS!! (MJ Sailing - Ep 334)
13 de julho de 2024 · 20 min · 31K visualizações
O que este vídeo aborda
Refitting the interior of a boat during extreme summer heat requires adjusting work schedules and material application to account for rapid epoxy curing.11:40 Temperatures reaching 95 degrees Fahrenheit with a heat index over 110 degrees force the crew to mix smaller batches of TotalBoat TotalFair epoxy fairing compound to prevent premature hardening.4:13 The project focuses on prepping the helm station, companionway steps, and forward V-berth for high-build primer.0:29 To ensure visual consistency, the crew re-routes the edges of the helm storage and companionway steps to a smaller 3/8-inch to 1/2-inch radius, filling previous voids with fairing compound before sanding with 120-grit paper.6:10 High humidity and rain occasionally necessitate keeping the boat under a tarp, which prevents spraying primer and forces a shift to interior sanding tasks.17:20 The crew plans to apply primer using a nap roller rather than a spray gun to avoid extensive taping in confined spaces.10:09
Mais de MJ Sailing
De MJ Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



