Gone with the Wynnsvídeo

THE HONEYMOON IS OVER

7 de abril de 2024 · 32 min · 527K visualizações · Subic Bay Freeport Zone

O que este vídeo aborda

Cruising life involves constant maintenance and troubleshooting of new boat systems, often requiring significant time for documentation and warranty claims. While preparing to depart Voskos for Palawan, the crew manages multiple technical issues, including a leaking pressure gauge in the bilge, a failed engine anode, and corrupted camera files. To protect their Carbo electric bicycles, they install custom aluminum plates and tie-downs in a forward locker, opting for a belt-drive system to minimize corrosion from salt air. They also address water intrusion near electronics by installing a temporary shower-curtain cover and plan to tighten numerous hose clamps throughout the bilge to prevent further leaks. Despite the challenges of sourcing marine-grade supplies in island countries, the crew utilizes local hardware shops and custom fabrication services to complete necessary repairs.4:25 The experience highlights that the transition from a new boat to a functional, reliable vessel requires persistent effort, as even minor equipment failures demand immediate attention to ensure safety and operational readiness.

Ver no YouTube

Mais de Gone with the Wynns

This Cost a Fortune... We Removed It Anyway06/2026We Thought We'd Never See These Again05/2026600 Miles Across the Most Feared Ocean on Earth05/2026Ice Camping Overnight on Antarctica05/2026

De Gone with the Wynns — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema