Sailing Yabávídeo
Complete tear down and rebuild of our rescued wooden boat's pilothouse — Sailing Yabá 155
15 de outubro de 2023 · 23 min · 120K visualizações · Santos
O que este vídeo aborda
The crew of the wooden vessel Yabá is completing a full interior rebuild of the pilothouse, replacing rotted structures and outdated electrical systems with new hardwood cabinetry.11:06 The renovation includes constructing a mini-galley storage area, custom drawers, and a rounded corner cabinet to improve flow and ergonomics.1:42 The team repurposed neglected ash wood and reclaimed cedar from an old schooner for the furniture, avoiding the need for new lumber.2:28 A significant structural change involved installing a "sun wall" to conceal a metal security gate at the main entrance, which provides a backup closure for the cabin.14:49 The crew also removed a bulky, redundant electrical panel and reconfigured the layout to maximize open space.11:58 While the furniture and woodwork are largely finished, the helm remains temporarily removed for ongoing steering system adjustments.22:27 The project successfully transformed a previously cramped, rotting space into an open, functional living area designed for better airflow and accessibility between the galley, table, and helm.
Mais de Sailing Yabá
De Sailing Yabá — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



