Expedition Evansvídeo

When In Doubt, GRINDERS Out...(again!) | Expedition Evans 58

12 de outubro de 2021 · 22 min · 128K visualizações · Annapolis, Maryland

O que este vídeo aborda

Brett and Jade Evans replace their boat’s failing battery bank with five 8D lithium batteries while preparing for the Annapolis Boat Show.3:26 The project requires removing three dead batteries, grinding down frayed fiberglass edges in the bilge, and applying a new finish to the compartment.3:28 After a previous attempt to paint the bilge with epoxy paint failed due to poor adhesion on peel-ply surfaces, the crew opts to apply a two-part epoxy primer followed by a wax-added gelcoat.11:29 The process involves fairing the surface with Total Boat compound, sanding, and applying the primer and gelcoat to achieve a durable, production-style finish.12:43 During the project, the crew experiences a total instrument and autopilot failure while sailing to a new anchorage, forcing manual steering.1:55 The bilge work is complicated by a vacuum hose detachment that spreads dust throughout the galley.14:31 Proper surface preparation and the use of wax-added resin are essential for ensuring a successful cure when applying gelcoat over epoxy primer.19:52

Ver no YouTube

Mais de Expedition Evans

What It's Really Like Anchored Off a UNINHABITED Island | EE 17605/2026Why Everyone is QUITTING Sailing | EE 17505/2026We Are No Different Than Any Other Sailor (we might be WORSE) | EE 17403/2026HOW WE EAT? (first we have to catch it) | EE 17303/2026

De Expedition Evans — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema