Sampson Boat Covídeo

Tally Ho gets an absurdly long Boom.

25 de novembro de 2023 · 18 min · 494K visualizações

O que este vídeo aborda

Zeal constructs a fife rail for the Tally Ho by milling Purple Heart timber posts and a teak top rail.0:33 The posts feature tenons that mortise through the deck and deck blocking, secured by bronze bolts fastened to an oak backing plate to manage vertical loads.10:02 This hardware provides a central location for making off halyards and topping lifts using belaying pins.1:37 Meanwhile, Nick builds a cherry face frame for the chart table area to house the 12-volt switch panel, gauges, and navigation displays.5:51 Bob mounts a custom bronze gooseneck fitting, cast by Port Townsend Foundry, to the spruce mast using two bands cushioned by leather strips to prevent fiber damage.12:24 The crew then installs the original-length boom, which attaches to the mast via the gooseneck to control the mainsail.13:36 The project restores the vessel to its original sail plan by utilizing the longer boom design.14:27

Ver no YouTube

Mais de Sampson Boat Co

Sailing through the "Needles"10/2026Sailing the British South coast!09/2026Tally Ho meets a tidal mud-berth!09/2026Tally Ho sails into England after 59 years overseas!08/2026

De Sampson Boat Co — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema