Expedition Evansvídeo
WE FINALLY PAINTED IT! why did we wait this long (Part 2) | EE 172
28 de fevereiro de 2026 · 25 min · 103K visualizações · Bahamas
Crew laughs wiping boat hardtop, Bahamas behind
O que este vídeo aborda
Brett and Jade Evans apply two coats of Awlgrip High Build Primer to their custom carbon fiber hardtop while anchored in the Bahamas.2:09 The pair removes stern rails and davit hardware to prep the surface, then mixes the two-part epoxy primer using a drill mixer, observing a 15-minute induction time before application.0:47 They use a combination of large rollers and paintbrushes to cover the structure, noting that the thick, "peanut buttery" consistency of the high-build product caused smaller rollers to disintegrate during the first coat.4:11 The project aims to unify the hardtop's appearance before future fairing and final painting, allowing the crew to prioritize cruising, spearfishing, and diving over further boat work.5:32 The couple confirms the hardtop’s structural integrity after a successful ocean crossing and continues to refine their integrated dinghy davit system with input from the crew of the vessel Excelsior.24:42
Mais de Expedition Evans
De Expedition Evans — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



