Salt & Tarvídeo

Salt & Tar: Ep.310- Steaming Up!

11 de setembro de 2025 · 21 min · 40K visualizações

O que este vídeo aborda

Garrett and Ruth install the in-whale and out-whale rails on their custom dinghy build, using alder timber to provide structural rigidity to the hull.0:03 To manage the tight radius at the bow without cracking the wood, Garrett uses a handheld garment steamer to soften the alder before bending it into place.0:41 He improves the steaming process by constructing a makeshift steam box from chimney pipe and foil.7:18 The assembly process involves cutting approximately 60 alder spacer blocks on a table saw to 1/8-inch thickness and 2-inch lengths, then dry-fitting the rails with clamps and screws to ensure alignment before final bonding with epoxy.3:49 By pre-drilling screw holes during the dry fit, Garrett maintains alignment while applying epoxy, which acts as a lubricant between the mating surfaces.6:29 The project concludes with the rails secured and ready for painting, as the crew prepares to return to their primary vessel, Red Aviva, in Mexico.19:39

Ver no YouTube

Mais de Salt & Tar

Salt & Tar: Ep.361- IN-THE-WATER Survey10/2026Meet Victoria - Tour of our William Garden 'Porpoise' built by Robin Fung in 197510/2026Salt & Tar: Ep.360- Good News10/2026Salt & Tar: Ep.359- Memory Lane09/2026

De Salt & Tar — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema