Wildling Sailingvídeo

This Ocean-Crossing Catamaran Rebuild Just Got Very Exciting.

2 de agosto de 2024 · 32 min · 153K visualizações · Amsterdam

O que este vídeo aborda

After 16 months of restoration, a project catamaran moves from a boatyard to an anchorage to begin sea trials and off-grid living.1:09 The owner fabricates a temporary aluminum tiller bar to replace a damaged fiberglass original and installs Scanstrut cable seals to route VHF and mast light wiring through the cabin top.16:17 During a six-mile transit through Amsterdam, the crew navigates busy shipping lanes and locks in 26-knot gusts.6:42 Upon arrival, the primary CQR anchor fails to set in 15 meters of chain, requiring a switch to a larger anchor for secure holding.14:19 The owner rigs a baby stay and lower shrouds using Dyneema splices and tensioning lanyards.21:09 The project concludes with the installation of the mainsail, which the owner attempts to fly without a wishbone boom by using a topping lift and mainsheet to maintain sail shape.27:54

Ver no YouTube

Mais de Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refit10/2026I Lifted Her Out For a Very Important Rebuild.09/2026One Final Refit Before Crossing The Atlantic.08/20262 Days Alone at Sea On my Primitive Double-Canoe.08/2026

De Wildling Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema