WORK HARD PLAY HARD! | Salvage boat repairs | Episode 97
14 de fevereiro de 2021 · 15 min · 487K visualizações · West Palm Beach
O que este vídeo aborda
Colin and his crew continue the restoration of their salvage Lagoon 450 by removing an engine to clear space for fiberglass repairs in the engine room.1:04 They disconnect the battery cables, shower drive, raw water lines, wiring harness, fuel lines, and coolant lines to extract the unit.1:16 Following the successful creation of a mold from a donor 2016 Fontaine Bejaud Helio 44, the team uses a reciprocating saw to cut out the damaged rear section of the Lagoon 450 to prepare for a dry fit of the new mold.3:17 Separately, the crew assists in a boat transfer by towing two catamarans from the Bahamas into a mooring in West Palm Beach.6:12 During the tow, they manage the vessels through an inlet at sunset, adjusting tow lines and using a tire as a fender to prevent damage in shallow water.10:13 They secure the boats to a mooring and install a solar light as required by the Coast Guard.11:52 The crew later takes a day off to go free diving and enjoy a barbecue.14:15
Barcos neste vídeo
Mais de Sailing Parlay Revival
De Sailing Parlay Revival — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



