Piratas Aderivavídeo

Day 6: Battle Monday ⚒️ Sealing leaks and saving the deck

12 de maio de 2025 · 29 min · 1K visualizações

O que este vídeo aborda

Jorman works to seal a boat’s deck and cockpit to prevent rainwater from flooding the bilge. He installs a temporary window over an open deck aperture using screws, though he notes that several mounting holes are oversized or misaligned, requiring future structural repair.11:48 To address water ingress through damaged deck hardware, he removes two broken vents and seals the remaining holes from old winches with adhesive tape to keep the underlying core dry.14:58 He identifies a weak, potentially delaminated section of the cockpit sole that will eventually require cutting out the fiberglass skin for reinforcement.18:16

For bilge maintenance, he utilizes a portable Johnson Bilge Mate pump modified with a 3-meter cable and a quick-connect plug, allowing for rapid deployment in different areas of the vessel.9:23 He also seeks advice on removing a stubborn, hardened contact adhesive residue left on the interior fiberglass walls after the removal of original vinyl liners.2:51 He finds that sanding the residue is ineffective because it gums up the abrasive, and solvents like acetone have failed to dissolve it.3:08

Ver no YouTube

Mais de Piratas Aderiva

The Solution to the Housing Crisis: Living on a Boat 🚤04/2026Is a boat only for the rich? The truth no one is telling.03/2026⚓ REVIVING THE DINGHY CHALLENGE – EPISODE 2 | The story behind our Fatty Knees02/2026Challenge: Living the Fatty Knees Dinghy 102/2026

De Piratas Aderiva — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema