Sailing Umavídeo
Discovering MORE ISSUES | Step 352
17 de junho de 2023 · 17 min · 178K visualizações
O que este vídeo aborda
The crew of Uma demolishes their existing galley to prepare for a complete interior redesign.Watch They remove Corian countertops, a custom corner-access storage unit dubbed the "Hefty Susan," and a Dometic condenser-based refrigeration system.0:42 The removal process reveals that the original bulkheads were only lightly tabbed to the hull with minimal fiberglass, providing no structural support and contributing to interior squeaking.14:35 The crew plans to replace these with properly tabbed bulkheads to increase hull stiffness.15:38 They also identify flaws in their previous galley layout, specifically noting that a fruit hammock proved impractical for a moving boat, as it bruised produce and prevented cleaning.2:33 The team intends to install a more energy-efficient drawer-style refrigerator in the new configuration.13:28 This demolition phase serves as a diagnostic step, highlighting the difference between furniture-supporting bulkheads and structural hull reinforcement.17:00
Mais de Sailing Uma
De Sailing Uma — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



