More
Language
Display mode
The On Deck Channelvideo
February 8, 2026 · 15 min · 4K views · St. Petersburg
What this video covers
Replacing a sailboat halyard requires stitching the new line to the old one to ensure a smooth transition through the mast sheave box.▶ 4:54 A professional rigger demonstrates the technique by using a needle and twine to create a secure, low-profile connection between the two lines.▶ 7:25 The process involves passing the twine through both ends multiple times to create a quadruple loop, followed by lock stitches to prevent the lines from separating under tension.▶ 8:29 This method avoids the increased diameter caused by taping a messenger line alongside the halyard, which often leads to jamming inside the mast.▶ 6:49 Before pulling the new line, the rigger emphasizes flaking the new halyard on deck to prevent tangles during the hoist.▶ 5:38 When replacing lines through a clutch, a stiff straw can serve as a makeshift guide to feed the line through the mechanism.▶ 13:55 Proper stitching and careful preparation prevent the new line from breaking free inside the mast, which would otherwise require professional intervention to retrieve.
More from The On Deck Channel
From The On Deck Channel — see the channel’s boat, crew, and every analyzed video.