Sailing Squibvideo

Sailing Squib May 2026 /2

August 6, 2026 · 20 min · 1K views · SQIP shipyard

What this video covers

Refitting the boat Squib at a shipyard, the owner completes several interior carpentry and electrical projects over an 18-day period.Watch Tasks include cutting and fitting wooden shelving for the starboard hull and bathroom panels, which are sanded with 240-grit paper and primed with multiple coats of paint.0:33 A sudden wind shift and dust storm complicate the painting process, forcing a delay in the schedule.7:59 The owner also fabricates custom aluminum plates to protect the fiberglass deck from chafe caused by reefing lines.3:54

For the electrical system, the owner replaces a non-functional Victron battery monitor with an Eco-Worthy unit.14:40 The installation requires drilling a 10mm hole through the bulkhead to route the display cables.17:40 After mounting the monitor, the owner configures the device settings, including battery capacity and a maximum charge voltage of 14.2V to match the existing solar charge controllers.18:52 The owner notes that purchasing electronics too far in advance of a refit can result in expired warranties before the equipment is ever used.15:44

Watch on YouTube

More from Sailing Squib

Sailing Squib - May 2026/3Sep 2026Sailing Squib - Contemporary WitnessJul 2026Sailing Squib - May 2026 /1Jul 2026Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33Jun 2026

From Sailing Squib — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue