Catamaran Mistertong video
#215 Our friends come to help us with our catamaran refit
May 5, 2026 · 56 min · 8K views
What this video covers
Djé and Nad are on day 44–46 of a catamaran refit, working through structural repairs to the forward beam area and bow sections of their Outremer.Watch The primary task is opening the starboard bow to replace a wood panel glued against the fiberglass laminate 18 months earlier — work done hastily from the inside with limited access — and to rebuild the watertight bulkhead separating the crash box from the rest of the hull.1:20 Djé explains the crash box design: closed-cell foam plus a sealed air void that, combined with a bilge pump in the bow compartment, provides multiple layers of flood protection in a collision.6:38 Interior inspection confirms the plywood hull panels are sound, eliminating the need to cut into the port bow — a schedule gain that also unblocks installation of the last trampoline fixing.9:34 The beam's aluminum mounting plates are being unbolted one pair at a time so the surrounding area can be sanded and repainted; nylon washers and Tefgen sealant are added between the stainless bolts and aluminum to prevent galvanic corrosion.21:07 Bolts cut to 20 cm prove difficult to remove in the confined space.25:22 Friends arrive at anchor that evening to help with the refit.24:42
More from Catamaran Mistertong
From Catamaran Mistertong — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



