Sail Lifevideo

The road back to boat work: moving into the workshop & our conex moving choices. Ep. 690

August 9, 2026 · 22 min · 70K views

What this video covers

Mads prepares his property for the arrival of two shipping containers by organizing his workshop and improving site drainage. He empties a tool trailer into a new workshop space, utilizing Harbor Freight storage carts and a toolbox to maximize floor area.2:22 To create a stable foundation for the heavy containers, he removes an above-ground pool using an excavator, then uses a Kubota tractor with a box blade to grade the site and fill low-lying, muddy areas with sand.9:57 He evaluates four delivery options, ultimately selecting a method that involves maneuvering the containers into place using heavy equipment and winches to minimize costs.17:44 To support the weight of delivery trucks, he plans to install 12-foot-wide geotextile fabric and 90 metric tons of gravel, scheduling the work to avoid the region's wet season between June and November.19:49 The project requires careful coordination of material deliveries and weather monitoring to prevent the site from becoming waterlogged.20:49

Watch on YouTube

Boats in this video

Antares Yachts 44Their boat

More from Sail Life

The road back to boat work: Bunker Makeover! Ep. 696Sep 2026The road back to boat work: The square eagle has landed! Ep. 695Sep 2026The road back to boat work: We're gravel rich & ready for shipping containers! Ep. 694Sep 2026Can I build an aluminum fuel tank with the xTool MetalFab laser welder and CNC? Ep. 693Aug 2026

From Sail Life — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue