Blue Horizonvideo

Will our boat crash?! | Gambia River Expedition

May 3, 2026 · 31 min · 94K views · Gambia

What this video covers

A 42-ft steel ketch navigates the Gambia River in West Africa, aiming to reach freshwater reaches to spot hippos.0:04 The crew faces a critical navigational obstacle at the Senegambia Bridge, built in 2019, which has a clearance height reported between 16 and 19.6 meters.0:16 With a mast height of 19 meters above the waterline, the crew times their passage to coincide with low tide during a spring tide to maximize clearance.7:22 They successfully transit the bridge with minimal clearance, noting that the antenna makes contact with the structure.24:29 Because the spring tide provides the lowest possible water level, the crew determines they must wait for the next spring tide cycle to ensure enough clearance for the return trip.25:33 Throughout the river transit, the crew manages tidal currents, navigates in darkness, and explores side creeks by dinghy.12:14 They encounter local wildlife, including crocodiles, while traveling through remote areas with no other cruising vessels.27:16

Watch on YouTube

More from Blue Horizon

We bought a piece of land in Brazil!Oct 2026Two Weeks Alone in Sweden (No People, No Phone, No Laptop)Oct 2026What's next for us.Sep 2026This is not how we imagined arriving in Brazil.Sep 2026

From Blue Horizon — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue