A Boat in the Woodsvideo

My boat sees daylight for the first time in decades - no. 12

June 7, 2025 · 24 min · 69K views

What this video covers

Joshua dismantles the cabin top of his boat to address structural rot and failing fasteners.Watch He removes four sheets of mahogany plywood and 250 linear feet of tongue and groove pine, discovering that steel nails used in the original construction had rusted due to leaks and salt air.9:41 To remove the stubborn plywood veneer, he uses a grinder fitted with a sanding pad and a jack plane for high spots.2:42 He extracts 374 screws using a manual brace to maintain torque control.8:08 To remove the bronze portholes, he fabricates a custom wrench from a metal T-post and steel bolts, adjusting the tool for each porthole’s unique screw hole spacing.19:25 He also replaces his nylon-reinforced tarp with a more durable setup using sheet bends at the corners and tarp clips to withstand wind.8:38 With the cabin top removed, he plans to clear the interior to begin replacing the hull frames.24:11

Watch on YouTube

More from A Boat in the Woods

Solo Boat Shed Build | 1 Side Roof Down, 1 to Go - No. 50Oct 2026Boat Shed Posts & Beams, Back to Work on the Boat - No. 50Oct 2026I Left the Woods to Learn How to Fix My BoatSep 2026Finishing the Roof & The Boat is Finally Home - No. 47Sep 2026

From A Boat in the Woods — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue