Project Brupegvideo

Building new engine beds in our steel expedition trawler - Project Brupeg Ep. 317

August 20, 2023 · 52 min · 37K views

What this video covers

Fabricating custom steel engine beds for a steel expedition trawler requires a precise sequence of mechanical alignment and structural welding. To establish the engine and gearbox position, the crew first bolts custom-made 12mm steel plates to the gearbox, then lowers the assembly into the bilge to align the output shaft with the propeller shaft.7:16 This vertical alignment determines the final placement of the engine beds.7:45 The crew uses a mag drill with a 16mm annular cutter to bore bolt holes in the steel plates, then uses a countersink bit to ensure bolt heads sit flush.2:32 Because the engine room environment prevents sandblasting, the crew uses a needle gun and coarse grinding to prepare the bilge surface for welding and paint adhesion.37:25 The design incorporates a 20mm gap between the new steel beds and the original structure to allow for a Chockfast epoxy pour, which provides a stable, vibration-dampening base.19:19 The final installation involves tack-welding the beds in place, grinding radiuses on all sharp corners to prevent stress risers, and sealing the joints with continuous weld beads to prevent water ingress and rust.31:15

Watch on YouTube

More from Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456Aug 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455Aug 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454Jul 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453Jul 2026

From Project Brupeg — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue