Garrett’s Adventurevideo

New Year, New Projects

January 20, 2025 · 19 min · 42K views · Fiji

What this video covers

Garrett performs a series of refit projects on his boat while docked in Fiji, prioritizing the installation of a new windlass and an inverter.Watch He mounts the windlass using a custom-fabricated metal backing plate, which requires drilling new holes through the bowsprit and grinding the deck to accommodate the chain fall.15:10 To avoid drilling through existing switch holes, he uses a scrap wood block to mount the foot switch and seals unused deck penetrations with fiberglass and micro-bubbles.11:53 Additionally, he replaces a failed inverter, mounting the new unit beneath the radio panel and rerouting wiring to clean up the electrical system.7:47 During the process, he discovers engine alignment issues, which he attempts to correct by adjusting the coupling bolts and using a feeler gauge to address a misalignment between the stern tube and the prop shaft.12:24 He uses lanolin-based grease to protect his new tools from corrosion.5:24 The windlass installation is completed with through-bolted hardware to ensure structural integrity.16:18

Watch on YouTube

More from Garrett’s Adventure

Fixing 87 Osmosis Blisters on my SailboatAug 2026Running my Sailboat VERY agroundMay 2026Sailing to and Exploring Remote Islands on Australia's East Coast NSWApr 2026Living on a Sailboat in SydneyApr 2026

From Garrett’s Adventure — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue