Sailing Nova Vitavideo

Atlantic crossing - WEST to EAST - RIGGING AND INSTRUMENT BREAKAGES! - Pt 4

November 25, 2025 · 18 min · 1K views · Atlantic Ocean

What this video covers

A Bavaria Yachts 36 crew faces multiple equipment failures while 700 to 1,000 miles from the Azores during an Atlantic crossing.11:48 A lower inner shroud began to part, with one strand visibly broken after sustained 25-knot winds and 3-to-4-meter seas.7:06 To preserve the rig, the crew dropped the mainsail and lashed the damaged shroud with Dyneema and shackles, opting to sail under headsail only to minimize slamming and shock loading.11:11 The vessel also experienced a total failure of the wind instrument system and a worsening engine oil leak that limits the ability to motor through calm patches.8:38 With forecasts consistently failing to provide predicted wind, the boat remains frequently becalmed, forcing the crew to drift to avoid sail-flapping stress on the compromised rig.17:26 The crew prioritizes rig integrity over speed, accepting a loss of 1.5 knots to ensure the mast remains standing for the remainder of the passage.15:43

Watch on YouTube

Boats in this video

Bavaria Yachts 36Their boat

More from Sailing Nova Vita

SAILING - Azores to UK 2026 - part 1Jul 2026Ponta Delgada Fireworks New Year 2026Jan 2026SAILING the AZORES - Horta to Sao Miguel - FOULED ANCHORDec 2025Atlantic crossing - WEST to EAST - Arrival in HORTA - Pt 5Dec 2025

From Sailing Nova Vita — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue