Sailing Miss Lone Starvideo

Fort Knocks Sailboat | PIRATE SHIP S15E11

January 4, 2023 · 25 min · 277K views · Bellingham, Washington

What this video covers

The crew of Miss Lone Star performs a series of maintenance projects while anchored in Anacortes, Washington, to prepare the vessel for future passages.2:13 Repairs include installing new Purple Heart wood standoffs for the stern chain plates to alleviate pressure and cracking on the cap rail, and mounting new line clutches and a winch to manage furling lines and the staysail sheet.11:14 To prevent furling jams, the crew installs an adjustable fairlead using Dyneema line to correct the feed angle into the drum.15:06 Electrical upgrades involve wiring a compass light and horn button at the upper helm station, alongside installing an Aqua alarm high-bilge sensor with a manual silencing switch.9:22 Finally, the crew services the dinghy outboard by replacing the impeller, housing, and gear oil, and installing a new propeller.18:28 These maintenance tasks improve system reliability and reduce the risk of mechanical failure during rough-weather sailing.

Watch on YouTube

More from Sailing Miss Lone Star

Why does this make me Nervous Aug 2026Boat Owners NightmareJul 2026Same Beach 10 years LaterJul 2026Should I LEAVE my Ship?Jun 2026

From Sailing Miss Lone Star — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue