Sailing Miss Lone Starvideo

Fort Knocks Sailboat | PIRATE SHIP S15E11

January 4, 2023 · 25 min · 277K views · Bellingham, Washington

What this video covers

The crew of Miss Lone Star performs a series of maintenance projects while anchored in Anacortes, Washington, to prepare the vessel for future passages.2:13 Repairs include installing new Purple Heart wood standoffs for the stern chain plates to alleviate pressure and cracking on the cap rail, and mounting new line clutches and a winch to manage furling lines and the staysail sheet.11:14 To prevent furling jams, the crew installs an adjustable fairlead using Dyneema line to correct the feed angle into the drum.15:06 Electrical upgrades involve wiring a compass light and horn button at the upper helm station, alongside installing an Aqua alarm high-bilge sensor with a manual silencing switch.9:22 Finally, the crew services the dinghy outboard by replacing the impeller, housing, and gear oil, and installing a new propeller.18:28 These maintenance tasks improve system reliability and reduce the risk of mechanical failure during rough-weather sailing.

Watch on YouTube

More from Sailing Miss Lone Star

We Sailed Into a Place Nobody Warned Us About EPS 319Sep 2026We Found Paradise. Then Everything Started Going Wrong.Sep 2026Why does this make me Nervous Aug 2026Boat Owners NightmareJul 2026

From Sailing Miss Lone Star — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue