S1, Ep4 So Much Work To Do!
July 11, 2024 · 22 min · 1K views · San Diego
What this video covers
The crew of *Into the Mystic* performs a top-end engine overhaul after diagnosing a stuck valve on the number four cylinder of their sailboat’s motor.1:54 They remove the cylinder head, replace the head gasket, and plan to install a new exhaust manifold, electronic ignition kit, and raw water pump rebuild kit to address rust and compression issues.12:58 Simultaneously, they strip old varnish from exterior wood using a heat gun and sander, and paint the interior cabin floor with bilge paint after abandoning a failed vinyl flooring installation.15:34 While working on the boat, the host also repairs a friend’s trailer by replacing eight brakes, repacking bearings, rewiring lights, and straightening a bent axle.16:30 After five months of weekend labor, the crew struggles to balance boat restoration with home renovations and professional commitments, leading them to reevaluate their timeline for getting the vessel seaworthy.17:57
More from Sailing Into the Mystic
From Sailing Into the Mystic — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



