Em & Nickvideo

We ruined HOURS of work in seconds....

July 26, 2026 · 21 min · 7K views

What this video covers

Replacing the bilge system on an Island Packet 40 requires running three new 1.5-inch bilge hoses from the bilge through the galley and companionway to the cockpit locker.Watch The owners install a Rule Gold 3700 electric pump, a Whale Gusher manual pump, a secondary electric pump, and an Ultra Safety Systems Pump Switch Jr. to improve offshore safety.1:09 To route the hoses through inaccessible areas, the crew attaches new hose to old hose using a wooden dowel and screws, pulling the assembly through the boat's internal structure.4:04 After struggling with tight clearances, they use a 4-inch hole saw to enlarge an existing opening in the cockpit locker to facilitate the run.13:07 The project fails when the crew cuts the hoses to length before accounting for the necessary anti-siphon loops, requiring them to reorder materials and restart the installation.18:32 Proper planning for anti-siphon loops is essential when installing new bilge pump discharge lines.

Watch on YouTube

More from Em & Nick

Building the Bilge system of our DREAMS (...again lol)Sep 2026We tore out the heart of our boat (electrical refit pt. 1)Aug 2026How much does it ACTUALLY cost to own a sailboat? (our finances for the first 9 months)Aug 2026The Backup Sailor | An Accidental Sailing Journey of a Lifetime (full documentary)Jul 2026

From Em & Nick — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue