Acorn To Arabellavideo

Prepping Arabella for Winter | Anchor Chain Upgrades & Getting Ready for a Season Ashore

November 14, 2025 · 25 min · 26K views

What this video covers

The owner of the 38-ft vessel Arabella prepares for a winter layup in Corner Brook, Newfoundland, by performing maintenance on the anchor system and interior condensation control. To improve depth estimation while anchoring, he marks 200 feet of 3/8-inch chain and 100 feet of 1/4-inch chain at 25-foot intervals using color-coded nylon rope segments sewn through the links.1:58 He replaces previous zip-tie markers, which proved unreliable, and tests the new tags to ensure they pass through the windlass without obstruction.3:05 For safety, he secures the bitter end of the chain to the Sampson post using a Dyneema line with a load-releasable knot, allowing for a controlled transition to a nylon extension rode if the full chain length is deployed.13:33 Additionally, he troubleshoots adhesive failure on plastic window covers intended to reduce interior condensation, adjusting his application technique to avoid heat-shrinking the edges.20:47 The winter period will focus on deck repairs, varnish, and replacing temporary stack packs with permanent fabric versions.23:13

Watch on YouTube

More from Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... AgainOct 2026Saying Goodbye to Newfoundland—and the Man Who Inspired ArabellaSep 2026Upgrading the Rudder and Another Trek To The CliffAug 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South CoastJul 2026

From Acorn To Arabella — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue