Catamaran Mistertong video

#147 Technical stopover in Sainte-Anne

September 13, 2025 · 33 min · 5K views · Sainte-Anne, Martinique

What this video covers

Djé and Nad perform maintenance and equipment upgrades on their catamaran, Mistertong, while anchored at Sainte Anne. The crew unboxes a portable Alpower power station, testing its 288Wh capacity, 220V output, and solar charging capabilities with a 100W panel.3:27 They also receive new black 13x13 mesh trampolines, noting the installation will require significant preparation and lashing work.18:36 Additionally, Djé attempts to replace a faulty shower sump pump in the head.21:12 After installing a new unit, he discovers the pump lacks sufficient flow rate to keep up with the drain, causing water to back up in the shower pan.25:51 The crew plans to depart for the south if an approaching depression worsens.0:37

Watch on YouTube

More from Catamaran Mistertong

#245 The break didn't last very long…Aug 2026#244 Worrying: Our boats held hostage in the CaribbeanAug 2026#243 Locked in until when???Aug 2026#242 The engine is no longer spitting!!!Aug 2026

From Catamaran Mistertong — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue