Project Brupegvideo

A Small Sanding Job... Project Brupeg Ep.397

April 6, 2025 · 17 min · 54K views · Gladstone

What this video covers

The crew of the former fishing trawler *Brewpeg* performs hull maintenance and anode reduction while hauled out at a shipyard.Watch To prepare the hull for new antifouling paint, the crew uses 40-grit sandpaper to key the surface, noting poor adhesion between existing red and black layers.0:42 They decide to remove approximately half of the vessel's existing sacrificial anodes, concluding that the boat's upgraded electrical system has eliminated the stray current issues that previously necessitated a high number of anodes.4:33 The crew also prepares the propeller for a PropSpeed application, initially struggling with a 6-inch sander before switching to a Scotch-Brite style purple disc on a battery-powered grinder for more efficient removal of old coatings.13:02 Work proceeds under time pressure due to a limited budget for yard time and an incoming weather system bringing rain and humidity.1:42 The project emphasizes the importance of proper surface preparation and specific application timing for silicon-based propeller coatings.11:22

Watch on YouTube

More from Project Brupeg

Over Engineering a Simple Bracket - Project Brupeg Ep. 458Aug 2026How strong to you want this winch mount? Brupeg strong... Project Brupeg Ep.457Aug 2026Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456Aug 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455Aug 2026

From Project Brupeg — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue