Sailing SV Delosvideo

The Toilet Episode 💩 Aluminum Catamaran Build Pt. 78

July 17, 2026 · 29 min · 236K views

What this video covers

The crew of the aluminum catamaran SV Delos installs interior finishes and plumbing systems for the port and starboard heads. To create a durable, moisture-resistant finish, they apply Sketch veneer—a concrete slurry on a backing—over PVC foam board substrates, using structural adhesive and sealant.2:34 The team bends the panels by heating them to achieve precise curves within the small compartments.3:56

The electrical and plumbing installation includes testing the NMEA 2000 backbone to control fresh water and gray water pumps.8:19 Brian and Bill verify the water tank selection valves and prime the fresh water pump to pressurize the system.12:18 Kaz customizes a vanity mirror by sanding the backing with 2000-grit sandpaper and applying frosting spray to create a backlit effect.15:06 The team performs a leak test on the marine toilet, which utilizes a macerator to process waste into a holding tank.20:14 The system allows for switching between fresh and salt water flushing.18:28 Successful integration of the electrical and water systems confirms the functionality of the pumps and valves before final interior assembly.12:18

Watch on YouTube

More from Sailing SV Delos

Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85Sep 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84Aug 2026EVERY INCH COUNTS....Aluminum Catamaran Build Pt. 83Aug 2026FIRST TEST: The Last Dinghy We'll Ever Buy??? Aluminum Catamaran Build Pt. 82Aug 2026

From Sailing SV Delos — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue