Project Brupegvideo
The last year on Brupeg in 25mins! - Project Brupeg Ep.335
December 24, 2023 · 25 min · 21K views · Australia
What this video covers
The owners of the vessel Brewpeg completed a year-long refit in Bundaberg, Australia, culminating in the launch of the boat.21:20 Major mechanical work included replacing the original engine with a reconditioned 400-horsepower Cummins engine and a new gearbox, which required cutting the roof to lower the drivetrain into the engine room.13:17 The crew fabricated and installed stainless steel components, including an air compressor system and a ladder for wheelhouse access.17:01 Electrical upgrades involved installing a Northstar radar, a Starlink satellite system, and extensive new cable trays.9:36 Structural repairs included welding the foredeck, modifying the anchor chain bucket, and repairing an aluminum pontoon dinghy.15:08 The team also installed holding tanks, applied two-pack paint to the engine room and foredeck, and mounted new solar panels from Bourgeois V. Following a successful engine alignment and a Chockfast mounting procedure, the vessel underwent sea trials.20:05 The project relied on a GoFundMe campaign and volunteer assistance from crew members including Duncan, Burke, Carlos, and Margot.23:38
More from Project Brupeg
From Project Brupeg — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



