Piratas Aderivavideo
Day 22: What if the problems never end? 😓
June 11, 2025 · 11 min · 515 views
What this video covers
Jorman continues the restoration of his sailboat on day 22 of his project, focusing on fiberglass repairs and plumbing maintenance.▶ 0:00 After inspecting previous fiberglass work, he identifies air bubbles in the cured resin and applies a polyester resin filler to rectify the imperfections.▶ 0:40 He replaces the bilge pump hoses, noting that the previous installation was incorrectly routed through the engine base and obstructed by debris.▶ 2:16 He installs new hose lines, utilizing approximately 4.5 meters for the bilge pump and an additional 0.5 meters for the through-hull discharge.▶ 3:49 The project receives a supply delivery including acetone, masking tape, and premium gloves from EDM Product.▶ 5:19 Jorman emphasizes the importance of maintaining a clean workspace as the restoration progresses to protect newly painted surfaces.▶ 5:19 He concludes the day by filling remaining holes and sanding patches to prepare for further structural work.▶ 8:50
More from Piratas Aderiva
From Piratas Aderiva — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



