Sail Lifevideo

Sail Life - Standing rigging & working on the engine - DIY project.

September 13, 2020 · 19 min · 85K views

What this video covers

Refitting the 20-year-old standing rigging and mechanical systems on the sailboat Athena requires replacing the wire rope rigging, installing a new engine control lever, and reconfiguring the Volvo diesel engine cooling and fuel systems. The host initiates a custom bow roller design to accommodate both a Rocna 33 and a Mantis M1 anchor, utilizing a pivoting head to prevent hull contact during deployment.1:32 Standing rigging replacement is prioritized due to a frayed strand on the headstay, with initial quotes for the project totaling approximately $2,970.3:00 Engine work involves installing a new manual control pedestal, replacing throttle and gear cables, and relocating the coolant expansion tank back to the engine block to simplify hose routing.4:45 Soundproofing is added to the engine compartment, and the host prepares to install a raw water strainer and fuel filter.12:10 Painting the hull remains weather-dependent, as fog forecasts complicate the curing window.16:35

Watch on YouTube

Boats in this video

Antares Yachts 44Their boat

More from Sail Life

The road back to boat work: We're gravel rich & ready for shipping containers! Ep. 694Sep 2026Can I build an aluminum fuel tank with the xTool MetalFab laser welder and CNC? Ep. 693Aug 2026The road back to boat work: shipping delays, site prep and bending metal with a 3D print Ep. 692Aug 2026The road back to boat work: Cutting trees, picking up plywood, and 240V in the shop. Ep. 691Aug 2026

From Sail Life — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue