MJ Sailingvideo

We're Nowhere Close to Finishing (MJ Sailing - Ep 259)

November 19, 2022 · 21 min · 56K views · Kent Island

What this video covers

Matt and Jessica continue the custom build of a 42-foot catamaran on Kent Island, focusing on exterior fairing and interior structural preparation before winter temperatures limit resin curing.1:16 The project remains in a tented workspace where heating constraints dictate the workflow.3:00 Recent progress includes cutting and bonding Vetus flush deck hatches and routing window edges with Total Boat fairing compound.1:59 The owners are finalizing the helm station design, opting for a layout inspired by HH catamarans that incorporates steps into the seating area to avoid obstructing windows.4:13 Interior work remains in the dry-fit stage for the galley and navigation station, as the couple awaits final decisions on electrical systems and battery placement before permanently bonding furniture.6:27 The master and guest hulls require extensive fairing, with current efforts concentrated on bulkheads and structural webbing.12:43 The build is limited to a two-person operation due to power supply constraints for tools and heating.15:35

Watch on YouTube

More from MJ Sailing

Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)Jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)Jun 2026Preparing Our Catamaran for Paint—and Me for Captain's SchoolJun 2026The Bad News: We Have To Cut This Bulkhead Out (MJ Sailing - Episode 377)May 2026

From MJ Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue