Sailing Catalpavideo

Reconditioning our Bomar Hatches Lots of Boat Work | Ep 312

October 6, 2022 · 19 min · 13K views · San Diego

What this video covers

Replacing crazed and leaking acrylic lenses on heavy-duty cast aluminum Bomar hatches requires a two-stage sealing process to ensure watertight integrity.0:05 The crew removes the old, cracked lenses and cleans the aluminum frames before installing new 6mm acrylic sheets.0:05 To prevent leaks, they apply a bead of sealant between the frame and the acrylic, leaving the protective paper on the lens edges until the sealant skins to ensure a clean finish.4:48 When bolt holes in the cast frames are stripped or snapped, the crew uses an easy-out tool or, if that fails, drills out the hole to install a helicoil insert.12:16 Once the lenses are set, the hatches are bedded into the deck using butyl tape and secured with bolts to ensure even compression.13:01 The project also includes installing new electric toilets and a bilge pump system to improve vessel safety during periods when the boat is left unattended.17:23

Watch on YouTube

More from Sailing Catalpa

Sailing to the most remote waves in the tuamotusOct 2026the most sharks we have ever seenOct 2026the clearest water we have ever seen...The TuamotusOct 2026arriving to the most remote atolls on earth...the TuamotusSep 2026

From Sailing Catalpa — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue