Sailing Umavideo

Boat Work REALITY Check | YT | Step 373

December 16, 2023 · 18 min · 122K views

What this video covers

Rebuilding a boat involves significant monotonous labor, including removing old systems, cleaning wiring, and prepping the hull for fiberglass work. The crew of Uma is currently stripping the interior to prepare for structural modifications, a process that requires removing the water maker electronics, shore power wiring, and plumbing from a defunct rainwater catchment system.2:30 They are also removing the autopilot and cutting out the existing pilot berth to replace it with a larger, more functional design.2:38 Despite the extensive demolition, they plan to retain the Cape Horn windvane, though they intend to replace chafed control lines and improve the system's routing.10:25 The crew also maintains a custom electrical setup that allows them to power the engine system with a single switch, bypassing the manufacturer's multi-switch configuration.7:32 These tasks represent the tedious, non-filmed work necessary to prepare the hull for glassing.

Watch on YouTube

More from Sailing Uma

Making Our Small Cockpit Twice as Useful | Step 497Oct 2026We Ditched Our Steering Wheel (And Built Something Better) | Step 496Sep 2026We're Finally Setting Sail Again!Sep 20264 Hours to Rig Solar for an 8-Month Solo CircumnavigationSep 2026

From Sailing Uma — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue