Sailing Into the Mysticvideo

S4, Ep40 DIY Swim Step Build on a Liveaboard Sailboat — Our Favorite Spot

October 12, 2025 · 29 min · 293 views · San Diego, United States

What this video covers

Tim and his crew fabricate and install a custom stainless steel swim step on their liveaboard sailboat to improve stern access and provide a platform for relaxing. The project begins with measuring and TIG welding a custom frame, which requires cutting into the boat's interior headboard to access the mounting points for through-bolting.5:15 After tack-welding the frame at a mooring ball, the team moves the vessel to a work slip to complete the final welding and installation.11:20 The welding process causes the metal frame to warp slightly, forcing the crew to redrill mounting holes and fill the original misaligned holes with epoxy.21:25 The final platform uses Starboard plastic, which is notched to fit around the support braces.24:25 The installation is finished with 5200 sealant to ensure a watertight seal.23:50 The completed swim step provides a stable platform for boarding and water access, successfully integrating with the previously installed solar arch and stern railing.

Watch on YouTube

More from Sailing Into the Mystic

We Find a Hand Built Steel Expedition Sailboat: Interview + Boat Tour [Ep 70]Oct 2026San Diego to Cabo by Sailboat: Every Dollar We SpentOct 2026Why We Ran North Before Hurricane Season Turned Scary [Ep 69]Sep 2026Tim's Favorite Anchorage in All of Baja | Agua Verde [Ep68]Sep 2026

From Sailing Into the Mystic — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue