Sailing SV Delosvideo

OLD Problems on Delos + NEW PROGRESS On the Build! Sailing Vessel Delos Ep. 513

July 4, 2025 · 28 min · 293K views

What this video covers

The crew of SV Delos performs extensive maintenance on their vessel and dinghy, Maggie, while hauled out in a boatyard. The team applies a barrier coat and two layers of bottom paint to the hull, emphasizing the importance of surface preparation with acetone to prevent peeling or blistering.0:52 They also service the dinghy’s outboard motor, including an oil and filter change, and repair a seized tilt-latch mechanism using penetrating oil.12:32 Interior renovations include installing new cabinetry, wardrobes, and a countertop in the master head and galley, with veneer components professionally spray-varnished.15:41 To facilitate painting the hull areas previously blocked by jack stands, the crew coordinates with yard staff to shift the supports.24:22 The project concludes with a successful sea trial of the dinghy and final preparations for splashing the vessel.25:59 Consistent maintenance and systematic project management are essential for transitioning from a major refit back to active cruising.

Watch on YouTube

More from Sailing SV Delos

OUR MAST: The INCREDIBLE Process! (EXTENDED CUT) Building Our Own Aluminum Catamaran Pt. 87Sep 2026You Need to See This 🤯 Building Our Own Aluminum Catamaran Pt. 86Sep 2026Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85Sep 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84Aug 2026

From Sailing SV Delos — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue