Sailing Catalpavideo

Real Life on a Sail Boat in a Boat yard in Mexico Ep 400

March 24, 2024 · 19 min · 16K views · Mexico

What this video covers

The crew of the 53-foot vessel Catalpa performs extensive maintenance on the anchor locker and ground tackle while in a Mexican boatyard. To prevent water from entering the bilge, they construct a false floor in the anchor locker and install a dedicated drain that routes water overboard.2:03 The project includes welding and reinforcing the bow rollers to reduce leverage and prevent the chain from slipping.18:02 The crew also installs a new DST810 transducer and replaces several through-hull fittings, using Loctite 577 and 4200 sealant for the connections.1:03 They re-galvanize their 90-meter anchor chain and sew webbing markers at 10-meter intervals to track deployment depth without an electronic counter.17:43 A Mantis swivel is installed on the anchor, secured with seizing wire to prevent accidental disconnection.14:21 Despite the upgrades, the chain occasionally jumps the gypsy wheel due to a sizing mismatch, requiring temporary manual intervention during retrieval.19:21

Watch on YouTube

More from Sailing Catalpa

they weren't expecting thisSep 2026one of the most remote islands on the planetSep 202629 days sailing Panama to French Polynesia the whole passageAug 2026what did we learn from a month at seaAug 2026

From Sailing Catalpa — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue