The Marinervideo
Update after Easter Break.
April 22, 2025 · 25 min · 1K views · Princess Inlet, Nova Scotia
What this video covers
The host of a large, former corporate-charter vessel currently moored in Princess Inlet, Nova Scotia, outlines a series of maintenance and refit projects following a winter season.0:21 The boat, which weighs 25,000 kilos, is secured to a mooring consisting of 10,000 kilos of concrete, 60 feet of one-inch ship’s chain, and a 14mm Dyneema pendant.1:23 Recent tasks include removing cockpit rope bags to replace them with a more efficient hook-and-bungee system, addressing water intrusion around deck port lights by removing temporary camping mats, and planning the removal of two 200-pound life rafts for service in Halifax.2:47 The engine room requires a fuel transfer pump overhaul, a new Raycor filter, and the installation of a replacement generator.9:15 The host also plans to modify the interior layout by removing a heavy bulkhead door and reconfiguring the head to reduce weight and improve utility for upcoming offshore events, including the Fastnet and Middle Sea Race.14:39 The vessel remains a work in progress as the host balances necessary repairs with long-term structural modifications.
More from The Mariner
From The Mariner — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



