Sailing Supernovavideo

Fixing everying we can think of on this boat [Ep. 148]

May 29, 2026 · 47 min · 20K views

What this video covers

The crew of a Sunreef 62 performs a series of maintenance and upgrade projects while preparing to depart St Martin for the BVI.37:55 To improve dinghy handling, they replace soft shackles with high-load hardware and install a custom, multi-line painter system featuring shock-absorbing bungee cords and Dyneema backups for secure towing and dockside tie-ups.0:04 They also install a custom-fitted ladder to assist guests boarding from the water.0:55

Structural maintenance includes re-bedding a loose Sunreef logo with SikaFlex and through-bolting a broken hatch handle that was previously held only by adhesive.15:22 To centralize scuba operations, the crew converts a storage locker into a dedicated dive room by installing a custom-cut shelf and wiring an electric scuba compressor.14:17 The shelf installation involves using plastic washers to prevent galvanic corrosion between aluminum brackets and stainless steel fasteners.32:58 The crew also cleans residual silicone from deck hatches to address persistent leaks.22:43 Proactive maintenance on aging boat components prevents the loss of hardware overboard.

Watch on YouTube

More from Sailing Supernova

Why is it so good! [Ep. 158]Aug 2026We keep adding the best stuff to this boat! [Ep. 157]Jul 2026What's the MOST important thing on a cruising boat? [Ep. 156]Jul 2026You will never find this spot! [Ep. 155]Jul 2026

From Sailing Supernova — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue