Tips from a Shipwrightvideo

Building the 23' V-Bottom Skiff - Episode 16: Fiber-glassing the bottom

July 3, 2021 · 14 min · 100K views

What this video covers

Applying two layers of 1708 fiberglass cloth to the hull of a 23-foot V-bottom skiff requires a coordinated team effort to maintain a wet edge and prevent premature curing.Watch The process involves using a slow-cure, two-to-one ratio epoxy to extend working time across the large surface area.3:50 Before applying resin, the team pre-cuts the cloth to length and rolls it up to ensure rapid, precise application.2:59 To prevent air bubbles at the chines and stem where the cloth resists bending, the crew secures the fiberglass with battens over polyethylene strips, held in place by small-diameter box nails.10:25 These nails are driven only deep enough to hold and are later removed, with the resulting holes filled using a syringe.10:54 A foam roller spreads the initial coat of thinned epoxy, while a fin roller ensures thorough saturation of the cloth.6:08 The use of a temporary rail along the hull allows the team to reach the centerline without leaning against the wet resin.6:47

Watch on YouTube

More from Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEMar 2026Progressive BevelingFeb 20261958 Harley Davidson Panhead Motorcycle - For SaleFeb 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale LinesJan 2026

From Tips from a Shipwright — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue