Acorn To Arabellavideo

Cedar Strip House Top, Gluing Up - Episode 171 - Acorn to Arabella: Journey of a Wooden Boat

July 16, 2021 · 25 min · 122K views · Massachusetts

What this video covers

Construction of the cedar strip house sides for the wooden boat *Arabella* involves laminating one-inch thick by one-and-a-quarter-inch wide cedar strips around a temporary mold.0:52 Each layer is epoxied and fastened with bronze ring shank nails, with corners overlapped in a Lincoln Log style to ensure a rigid, leak-resistant structure.1:22 To improve ergonomics and simplify future caulking, the base of the house sides is cut at an angle to reduce the step height above the deck.2:14 Steve uses temporary cedar off-cuts clamped to the surface to provide purchase for clamps during the glue-up process.4:00 After assessing deck camber and headroom, the team drills holes through the sill and deck beams to prepare for final bolting.22:35 Due to a family emergency, Alex departs the project, and the team transitions to new filming equipment while Robin assists with the remaining cedar strip laminations.10:49 The crew also tests interior finish samples, including cherry burl, white ash, and white cedar, alongside TotalBoat wet edge paint.15:14

Watch on YouTube

More from Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... AgainOct 2026Saying Goodbye to Newfoundland—and the Man Who Inspired ArabellaSep 2026Upgrading the Rudder and Another Trek To The CliffAug 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South CoastJul 2026

From Acorn To Arabella — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue