PAT | FRANKIEvideo
72 Hours to Splash Day ⛵️ | BOAT DAMAGE DISASTER Part 11
January 19, 2025 · 23 min · 18K views
What this video covers
Final preparations for relaunching the boat include re-stepping the mast, applying anti-fouling paint to the keel, and servicing the sail drive. The mast is back in place with pilot lines removed and reefing lines prepared, though final rigging tensioning and sail installation will occur after the boat is in the water.2:44 The keel, previously repaired for structural damage and delamination, has been primed and coated with anti-fouling.6:18 Maintenance tasks completed in the final days on the hard include changing the sail drive oil, inspecting the shaft seal, servicing the engine, and replacing through-hull fittings.16:16 The crew also cleaned the interior, painted the bilge in the garage area, and reorganized spare parts.13:42 An electrician is scheduled to finalize the energy system once the boat is afloat.19:37 The boat is slated for splash day two days after these final tasks.17:40
More from PAT | FRANKIE
From PAT | FRANKIE — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



